Former Administrat
  • 亚洲威廉
    Research Institute
    Research Institutes
    WeChat official account for the department
    R&D Teams
    Distinguished Alum
    WeChat official account for undergraduate students of the department
    Distinguished Alumni
    Overview of the De
    WeChat official account for graduate students of the department
    Talents
    Faculty & Staff
    WeChat official account for alumni of the department
    Retirees
    亚洲威廉最新版下载
    WeChat official account for the Energy Internet Research Institute, Tsinghua University
    亚洲威廉
    Introduction
    WeChat official account for the Sichuan Energy Internet Research Institute, Tsinghua University

History

亚洲威廉最新版下载电机系

Department Adminis

亚洲威廉最新版下载电机系本科生

Former Administrat

亚洲威廉最新版下载电机系亚洲威廉最新版下载

Research Institute

亚洲威廉最新版下载电机系校友会

Research Institutes

亚洲威廉最新版下载能源互联网创新研究院

Distinguished Alum People & Viewpoints

Current locations: Home > News > People & Viewpoints > Content

报告人:Dr. Yingzhong Gu

Development Lead, GE Energy Consulting, General Electric Inc., Schenectady, New York

Vice President, North American Chinese Power Professional Association (NACPPA)

2016年10月24日上午10:00

地 点:西主楼3-102

联系人:钟海旺

ABSTRACT: Power system economic planning is a core part of a comprehensive power system planning process, which not only considers the needs for reliability, public policy and resource adequacy but also it well addresses the long-term needs for a more economical and efficient power grid operation. The power system economic planning, using production simulation tool, evaluate the current and future state of bulk power grid and the economic impact of various projects to reduce the overall operation cost in the long run. GE Multi-Area Production Simulation (MAPS) is widely adopted to conduct various power system economic planning studies including renewable integration studies, market efficiency evaluation studies, transmission planning studies, and congestion assessment studies, etc. One of the major challenge of power system economic planning is to conduct long-term (i.e. 20-30 years) production simulation for large scale power systems. The big data analytics technology is a key to facilitate the state-of-the-art power system economic planning. This seminar introduces some major efforts GE is taking toward this new era.

—— Share ——

Close

正文、栏目列表与相关阅读构成完整路径,适合按主题持续查阅。